Monday, October 17, 2016

Waihao Forks.....On Point.


Am_Fet, with great relief, pens:

Whew!  We are up to date.  This is the latest report from Backward Engineering in Karori ("Where the past is being made today!").


The curtain wire is now glued down, and then the ends of the push-pull wire have been bent and threaded into the pre-drilled holes in the switches using small pliers.  The kink in the push-pull wire can be opened and closed slightly to make fine adjustments to the length of the wire.



All the brass dropouts to get power to the track from underneath are now fitted and soldered on.

Next, turn it all over and attach wires to the switches and dropouts."


No comments: