Looking at the calender reveals that Easter is the first week in April in 2012. This gives me sod all time to get Paekakariki up and running. Having a bit of a think about what needs to be done, vs what REALLY needs to be done I made a start on the jobs that need to get sorted.
The most important thing is that everything runs well, with no/few rough spots. Thus I've been putting some work in on identifying bad spots that need fixed. This has been a mixture of using rolling stock to identify bad spots and the NMRA track gauge to confirm them. As I wasn't planning to play with the soldering iron till later, I just marked them in red.
The more observant will note that the locations tend to be in the same areas and related to the point frogs. These early points appear to be worse than my later efforts once I had sorted out what I was doing. The check rails seem to be the most common fault. The one on the right seems to be from the really early period where I was trying to get Peco wheelsets through everything and has escaped alteration. The one on the left is too wide and allows the lead Ed bogie to pick the frog. A check with the track gauge shows that these can all be narrowed which should 'fix' the problems. I'll slowly work through the rest of the layout during the week, then have a soldering session to sort everything out.
Monday, December 12, 2011
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment