I had been thinking about the edging of the layout. Given my dislike for MDF, and preference for plywood, it might come as some surprise that I have decided to go with MDF. A special on 3mm sheet at Mitre 10 certainly shifted my thinking. So, the first piece is up.
Wednesday, March 14, 2012
Back into it
I had been thinking about the edging of the layout. Given my dislike for MDF, and preference for plywood, it might come as some surprise that I have decided to go with MDF. A special on 3mm sheet at Mitre 10 certainly shifted my thinking. So, the first piece is up.
Sunday, March 11, 2012
How good is your wiring??
Am_Fet scribbles:
Found this on the Interweb Thursday on Makezine (actually linked from an Analog Synth forum I'm a member of).
How-To: Splice Wire to NASA Standards
Some commenters on Friday’s post about using a washer as a soldering aid noticed my sloppy splicing technique and were kind enough to educate me about the so-called “Western Union splice,” aka the “Lineman’s splice,” which is the preferred method for twisting solid-core wire leads together for inline electrical connections.
Developed during the heydey of the telegraph, the Lineman’s splice is designed for connections that will be under tension. It is commonly claimed that, properly made, a Lineman’s splice is stronger than the wires of which it is composed. In any case, it is a time-proven method, and, coolest of all, one of NASA’s Required Workmanship Standards. To wit, in a NASA-approved Lineman’s splice:
- The conductors shall be pre-tinned.
- There shall be at least 3 turns around each conductor and the wraps shall be tight with no gaps between adjacent turns.
- The wraps shall not overlap and the ends of the wrap shall be trimmed flush prior to soldering to prevent protruding ends.
- Conductors shall not overlap the insulation of the other wire.
Though the Lineman’s splice was originally used without solder, today soldering is common. And NASA insists on it:
- Solder shall wet all elements of the connection.
- The solder shall fillet between connection elements over the complete periphery
of the connection.
This material comes from page 84 of NASA-STD 8739.4, which is a great reference if you’re interested in best practices for interconnecting cables and wires. [Thanks, Alex Barclay!]
Saturday, March 10, 2012
Saturday
Meanwhile a flurry of postings last night and this morning (and still this afternoon) have come up with a (very) workable mini module standard that looks like it might be a goer. It looks very practical, and there might be 1/2 a chance that we can have some bits on display at the convention, assuming it can be made to work. Its a watch this space, but I think it could be great for those with not that much room who would still like to do a bit of modeling and have the possibility of joining up with other like minded individuals.
The plan is to have the bits laser cut, and possibly preassembled so that anyone can be sure that their ends will connect to everyone elses ends.
(Right, off to bottle some more beer as well)
Thursday, March 08, 2012
Mmmmmmmm........
I would have written something last night about the seeming lack of interest in the convention shown by NZ120 modelers, but was a bit busy in the great outdoors. I was fishing under the Halcome bridge (with the father in law), and was just watching a class 30 haul a freight north over the bridge in the sunset while absent mindedly casting into the river, when this blundered onto my hook. Not quite sure how it managed to get so big, while staying so dumb (a question we could ask of some people around I'm sure).
However I am in the good books at home (a very in that sentence would not be out of place), and he's going to be smoked over Manuka chips for tea tonight.
(hopefully I stay in the good books long enough to get a 100 buck order with North Yard paid for. Guys, if you got Paypal I could hide these things much better)
We now return you to the usual drivel.
Monday, March 05, 2012
40 odd days and counting
A bit of glue and placing on the layout and we have..
Not much but at least it is a start. I will have to add the control buildings, and I'd love a picture or plan of what the filling stand pipes looked like. I will also have to have a go at the coaling stage end of the fuel point.
UPDATE; I forgot to add that in the middle of all this yesterday, the lady of the house put in an appearance, and the first question was 'So how is this getting to Wellington?'
'An excellent question' I replied.
I've got no ideas at the moment....
Friday, March 02, 2012
Conventioning II
A couple of things I would like to raise (well, one thing) is the sorting out face to face for modular standards. I can see 2 at the moment,. The first is the ones that have been semi thrashed out over at NZ120.org. this is just about done and really only needs the track connections between the modules sorted.
The second is my personal hobby horse, the mini module.
At the moment I'm leaning towards something maybe 300 wide, and 600-900 long (or in multiples of this). This would allow people with not too much room or time to build a small home layout to build a small scene that could be brought together to run with others. I see no reason why these could not be attached to converter modules for the larger system as an industrial siding or branch line.
Again there needs to be a sorting out of how the track approaches the ends. I've been thinking along the lines of having computer cut ends in 8-10mm ply with markings in where the rail ends sit. However with personal experience I'm not sure how this can be made to work with low profile wheels without a lot of side-to-side rocking or even derailments
What other topics do people think should be discussed?
Thursday, March 01, 2012
Conventioning I
-Waiting on the chassis for the J sheep wagons and the tops for the Uga's. This is going to require more wheels, bearings and in the Uga's case, the type 97 bogies. requires money.
-The layout has not been progressed much further due to the lady of the houses recent surgery. hopefully this will move on a bit faster, as I now have a source of extruded polystyrene (at a very reasonable price I think). I scored some of the crap white polystyrene from a packing crate at work which will do for the hills. The plywood is another thing that should work out. I need to make 2 end parts, and while I would like to build a couple of return loops, realistically its not going to happen.
Oh, and did I say I've got no idea about how it will get down there? It might fit into the car but...
-Paying for the convention, plus 4 nights board. The lady of the house is keen to come down for the weekend, and so that's even more money. At least nowhere is particularly far in downtown wellington, which is one of the reasons that I really love it. Another plus is that none of our favorite restaurants were named in the bad restaurants in the Dom Post today. Follow me and I'll show you how to dine well for not too much.....
(Oh, and with a second person in the car, there is no way that the layout will fit as well. It would only just fit in with the drivers seat well forward.)
-North yard has come through with some wheels for the bush tram layout. these are a bit steeper than I was expecting, but Markits stopped making them in 2008, so I'm lucky to get them. Plus the brass bits to make the log bolsters that's even more money.
So, as you can see its getting to be an expensive month. Maybe if I stop eating.....
